November Velodrome Workday

The November Velodrome Workdays is in the books!

If you missed it – don’t worry we will be releasing a December Workday date soon.

A big thank you to the following:
Aaron Freeman
Bill Thomsen
Brian Sullivan
Carleton Hall
Christina Panella
Chuck Hancock
Coby Marsden
David Schwalbach
Gary Morgan
Heather Riniker
Kevin ODonnell
Kim Fuller
Peter Antonvich
Thomas Teichmann
Travis Neumuller
Michael Tharp

Accomplished Tasks for the day include:

  • leaf bagging
  • bathroom lock jamb install
  • ventilation fan for men’s room
  • file cabinet clean out
  • part of turn 4 pressure washed
  • removal of fallen tree parts
  • removal of damaged boards
  • fixing and cleaning of gutters
  • a good start on bike repairs
  • flag rope replacement
  • re-wrapping of turn one cabling
  • re-hanging of turn three cabling
  • trash can cleaning
  • pizza eating

Notes:
1. velodrome is reopen it’s ride at your own risk
2. verify the track is safe before riding
3. leafs are slippery even when not wet you will slide off the track and hurt yourself if they aren’t cleared from the track